Table 1
Architectural, Engineering and Related Services Price Index – Not seasonally adjusted
Relative importance1 | Third quarter 2013 | Second quarter 2014 | Third quarter 2014p | Second quarter to third quarter 2014 | Third quarter 2013 to third quarter 2014 | |
---|---|---|---|---|---|---|
% | (2013=100) | (2013=100) | (2013=100) | % change | % change | |
Architectural, Engineering and Related Services Price Index | 100.00 | 100.2 | 99.8 | 100.1 | 0.3 | -0.1 |
Architectural and landscape architectural services2 | 10.45 | 100.2 | 102.8 | 104.1 | 1.3 | 3.9 |
Engineering services | 82.06 | 100.2 | 99.2 | 99.3 | 0.1 | -0.9 |
Surveying and mapping services3 | 7.49 | 99.9 | 102.2 | 102.6 | 0.4 | 2.7 |
p
preliminary
Source(s):
CANSIM table 332-0018.
Table note 1
The relative importance is calculated by dividing the weight of each industry group by the sum of weights. This weight corresponds to the aggregate revenue of establishments at the time of sample selection.
Table note 2
This aggregation combines the North American Industry Classification System (NAICS) codes 54131 and 54132.
Table note 3
This aggregation combines NAICS codes 54136 and 54137.
- Date modified: